Maintenance and maintenance
Regular inspection of warning signs and regular machine maintenance: daily hygiene, weekly inspection of the body circulation system (if the sound is abnormal, the housing is overheated), the relief valve assembly is working properly, monthly inspection of the pressure of the machine tool and the failure date of the fire extinguisher to meet the specified requirements. Drive system lubrication: Mainly X, Y and Z axis, Z axis is used once a month, X and Y axis is used once every two months. Replace the filter and clean the tank: The filter is determined according to the company's processing frequency and processing materials. Copper electrodes mainly need to be replaced for 6 to 12 months; Graphite electrodes are mainly used for 3 to 6 months.
Previous:How to install a milling machine?
Next:Detail of spark machine |
Back to list |
copyright : Chenzhou Fuyang Trading Co., LTD
Design:Yunding Date